- Construction of major bridges (8 Nos.) except superstructure i.e. foundations, abutments, piers with wing walls and return walls etc. between km. 115 to 155.600 in connection with Doubling of Udhan - Jalgaon section in Mumbai Division of western railway.
- Construction of 2 lane Road Over bridge on pile foundation , Substructure and super structure with composite girders as per Railway’s approved design and drawing over level crossing No. 25 & level crossing No. 8 on Nagda- Ujjain section of Western Railway.
- Construction of Road Over Bridge on pile foundation consist of RCC Sub structure/Super structure with Steel composite girder etc. as per Railway’s approved drawings in lieu of level crossing No 135 between Nardana & Amalner stations and level crossing No 144 at Dharangaon station of Western Railway.
- Providing ROB No. 76 A , 1x36.0m span Composite steel Girder at CH. 37280.00 between CTD- Alirajpur in connection with CTD- Dhar new line project.
- Construction of Road over Bridge No. 3 & 6 Between Chotaudepur – Alirajpur (Gujarat State) section in connection with providing New BG Line between CHOTAUDEPUR-DHAR.
- Construction of Road Over Bridge in lieu of LC No. 213 between MYG-Itola stations of ST-BRC section
- Construction of Major Bridges except super structure i.e. foundation abutments, piers, wing walls, return walls etc between km. 115.00 to 155.600 in connection with doubling of Uthna-Jalgaon section in Mumbai Division of Western Railway
- Construction of Road Over Bridge No. 23 & 34 between Chhota Udepur - Alirajpur in connection with New BG rail line between Chhota Udepur - Dhar
- Construction of major bridges between km 57.00 to 117.00 in connection with doubling on udhana - Jalgaon secion in mumbai division
- Construction of major bridges having spans of 18.30 m PSC Girder in connection with Ankleshwar - Rajpipla gauge conversion project
- Construction of new major bridge no. 30 PSC box girder bridge on Angori River in connection with construction of new BG rail line between Dahod - Indore
- Construction of new major bridge no. 13 PSC girder bridge in connection with construction of new BG rail line between Dahod - Indore
- Construction of new major bridge no. 9 PSC girder bridge in connection with construction of new BG rail line between Dahod - Indore
- Construction of ROB at LC No. 264B at Boriyavi between Ahmedabad –Mumbai electrified Section & ROB at LC No. 211A between Mehsana – Palanpur section
- Construction of ROB 33B & construction / extension /srtrengthening of existing Major bridges,Casting & launching of PSC girders between Jetalsar –Wansjalia in connection with Gauge Conversion Project
- Construction of Bridge No. 883 ( 14 x 18.30 m )PSC Girder bridge on Pile Foundation between Umardasi & Chappi.
- Construction of Major bridges No.75A & 76 B at NCX 144/04 in connection with providing permanent diversion for kachch branch canal between Bhabhar – Devgam on Palanpur – Radhanpur section
- Construction of various Major bridges of 18.30 m PSC girders from km 65 to 102 between Tikamgarh and Kajuraho in connection with New B G Rail Line of Lalitpur – Khajuraho Project
- Construction of Bridge No. 55 (5x18.30 ) by providing pile foundation between Himmatnagar & Asarwa.
- Construction of 5 Major Bridges of 18.30 m PSC Girders in connection with new B G rail line of Lalitpur –Khajuraho Project
- Construction of Bridge No. 290 and casting , launching of PSC girders between Palanpur – Gandidham Gauge conversion Project
- Construction of 3 major Bridges of 18.30 m PSC Girders in connection with new B G rail line of Lalitpur – Khajuraho Project
- Construction of 2 major Bridges of 18.30 m PSC Girders bridge in connection with new B G Rail Line of Lalitpur – Khajuraho project
- Poviding Precast RCC Box through Railway Embankment by Box Pushing Method at Vartej & Botad
|
|
|
|
|
|
|
|
|